 Sized to process 24,000 tons of steel per year and to mooring two FPSO's simultaneously, CMO Shipyard was designed for construction and integration of modules and platforms, as well as for ship and platforms repair and maintenance.
CMO Yard will also have a construction site which will allow fabrication of jackets, single point mooring buoy, accommodation module etc.
The Yard’s privileged location provides a competitive advantage in meeting the demands of offshore industry, and provides an optimized logistics.
|
 |
INDUSTRIAL FACILITIES
 |
Mooring Pier: 700m |
 |
Administrative Area: 25.000m² |
 |
Industrial Area: 100.000m² |
 |
Warehouse: 12.000m² |
 |
Construction Area: 316.000m² |
 |
Wet Dock: 350m x 120m |
|
Main equipment: |
|
- 2,000 ton gantry crane for lifting and integration of Semis SS, Drill Ships, and FPSO's.
- 2 quay cranes with 50 tons capacity each.
|
|