Sized to process 24,000 tons of steel per year and to mooring two FPSO's simultaneously, CMO Shipyard was designed for construction and integration of modules and platforms, as well as for ship and platforms repair and maintenance.

CMO Yard will also have a construction site which will allow fabrication of jackets, single point mooring buoy, accommodation module etc.

The Yard’s privileged location provides a competitive advantage in meeting the demands of offshore industry, and provides an optimized logistics.

INDUSTRIAL FACILITIES

Mooring Pier: 700m
Administrative Area: 25.000m²
Industrial Area: 100.000m²
Warehouse: 12.000m²
Construction Area: 316.000m²
Wet Dock: 350m x 120m
 
Main equipment:
 
  • 2,000 ton gantry crane for lifting and integration of Semis SS, Drill Ships, and FPSO's.
  • 2 quay cranes with 50 tons capacity each.

Copyright - CMO Construção e Montagem Offshore S/A